Plans to begin smashing particles at the Large Hadron Collider (LHC) may be delayed after a magnet failure forced engineers to halt work.
The failure, known as a quench, caused some of the LHC's super-cooled magnets to heat up by as much as 100 degrees. The fire brigade were called out after a tonne of liquid helium leaked into the tunnel at Cern, near Geneva. The LHC beam will remain turned off over the weekend while engineers investigate the severity of the fault.
Source: http://news.bbc.co.uk/2/hi/science/nature/7626256.stm
Saturday, 20 September 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment